Pipe Size Chart

Quick answer: Nominal pipe size is a label, not a measurement. A 1″ pipe has a 1.315″ OD and a 1.049″ bore in Schedule 40. The OD stays fixed across schedules so fittings interchange — only the wall thickness and bore change.

Outside diameter, wall thickness and inside diameter for every common pipe size in Schedule 40 and 80, plus copper tube dimensions and what the size difference does to flow.

Nominal pipe size (NPS) chart

The single most confusing thing about pipe: the nominal size is not a measurement of anything. A “1 inch” pipe has a 1.315″ outside diameter and a 1.049″ inside diameter. Neither is one inch. The name is a legacy label, and the outside diameter is what stays fixed so fittings interchange across wall thicknesses.

NPSOD (in)Sch 40 wallSch 40 IDSch 80 wallSch 80 ID
1/80.4050.0680.2690.0950.215
1/40.5400.0880.3640.1190.302
3/80.6750.0910.4930.1260.423
1/20.8400.1090.6220.1470.546
3/41.0500.1130.8240.1540.742
11.3150.1331.0490.1790.957
1-1/41.6600.1401.3800.1911.278
1-1/21.9000.1451.6100.2001.500
22.3750.1542.0670.2181.939
2-1/22.8750.2032.4690.2762.323
33.5000.2163.0680.3002.900
44.5000.2374.0260.3373.826
66.6250.2806.0650.4325.761
88.6250.3227.9810.5007.625

Every row satisfies OD − (2 × wall) = ID. Schedule 80 has the same outside diameter as Schedule 40 — the extra wall thickness comes out of the bore, which is why Sch 80 flows less.

Why OD is fixed: so a Schedule 40 and a Schedule 80 pipe of the same NPS take the same fittings, the same threads and the same hangers. All the schedule changes is how much steel or PVC sits between the outside and the bore.

Copper is measured differently again

NominalActual ODType M wallType L wallType K wall
1/2″0.625″0.028″0.040″0.049″
3/4″0.875″0.032″0.045″0.065″
1″1.125″0.035″0.050″0.065″
1-1/4″1.375″0.042″0.055″0.065″
1-1/2″1.625″0.049″0.060″0.072″
2″2.125″0.058″0.070″0.083″

Copper tube OD is always nominal + 1/8″. Type M is thinnest and cheapest (interior supply), Type L is standard for most potable water, Type K is thickest and used underground.

Choosing a schedule

PVC is not rated for hot water. Standard white Schedule 40 PVC softens well below household hot-water temperature. Supply lines carrying hot water need CPVC, PEX or copper.

Flow capacity falls off fast

Flow is roughly proportional to the bore area, and area goes with the square of the radius. Halving the diameter cuts flow to a quarter, before friction is even considered. It is why stepping a 3/4″ supply down to 1/2″ for a long run costs so much more pressure than the size difference suggests.

NPSSch 40 IDBore area (sq in)Relative to 1/2″
1/2″0.622″0.3041.0×
3/4″0.824″0.5331.8×
1″1.049″0.8642.8×
1-1/2″1.610″2.0366.7×
2″2.067″3.35611.0×

Frequently asked questions

What is the actual outside diameter of 1 inch pipe?

1.315 inches. Nominal pipe size is a label, not a measurement — a 1 in NPS pipe has a 1.315 in OD and, in Schedule 40, a 1.049 in inside diameter.

What is the difference between Schedule 40 and Schedule 80?

Wall thickness. Both have identical outside diameters so they share fittings, but Schedule 80 has a thicker wall and therefore a smaller bore. In 1 in pipe, Sch 40 has a 1.049 in ID while Sch 80 has 0.957 in.

Is copper pipe measured by inside or outside diameter?

Neither exactly. Copper tube is sold by a nominal size, and the actual outside diameter is always nominal plus 1/8 in — so 1/2 in copper has a 0.625 in OD. The wall thickness then varies by type M, L or K.

Can I use PVC for hot water?

No. Standard white Schedule 40 PVC softens well below household hot-water temperature and is not rated for it. Use CPVC, PEX or copper for hot supply lines.

More reference charts

→ All 19 reference charts

Last reviewed August 2026 · how we source these figures

Sources for the figures on this page

Every number on this page and where it comes from, so you can check it rather than take our word for it.

Standards bodies and manufacturers revise these tables. Where your product’s data sheet disagrees with a value here, use theirs. Local codes amend the model IRC — your building department governs. See our full methodology.